Waste Excavation/River Bank Reconstruction – Indianapolis, Indiana

Customer:

City of Indianapolis

Scope of Work:

Clearing and grubbing; construction of gravel access road; construction of a total of 3,000 LF of temporary dam in 500 LF sections; dewatering; excavation of 4,500 CY of exposed landfill waste; reconstruction of river bank entailing 4,700 CY of protective clay, 11,000 SY of geotextile fabric, 4,461 SY of geogrid, 800 CY of top soil, 13,033 SY of seeding, tree plantings and 31,000 tons of rip rap/stone slope protection.


©2011 HIS Constructors, Inc. All rights reserved.